logo
A powerful architecture & Construction theme. Construct your website in the perfect Ratio.
Alienum phaedrum torquatos nec eu, vis detraxit periculis ex, nihil expetendis in mei. Mei an pericula

Archive

Hospice of North Idaho Multi-Purpose Room

Hospice of North Idaho

This new 15,000 sf, two story community building was part of a master plan for the “Hospice Campus”.  The first floor has a lobby/waiting area upon entry with central receptionist station, multi-purpose room designed with the ability to be divided into three individual spaces, training...

Dutch Woods Master Plan

Architects West job was to provide a master plan vision for the potential development of an approximately 400 acre site, originally a family homestead ranch overlooking Lake Pend Oreille. The master plan is conservation oriented, with an optimal number of residential units/lots and as much as...

Post Falls High School Auditorium

Post Falls HS Gym & Auditorium

Architects West initially designed the 194,750 square foot Post Falls High School, which was completed in 2000.  The original design planned for the future addition of an Auditorium facility. However, the Gym addition was not planned, so attaching it to the existing athletic facilities required...

Union Gospel Mission Rescue Center

Union Gospel Mission’s Women & Children Recovery Center

Master planning and design of this multi-building campus includes a residential recovery center for women and children, a transitional housing center for short term stays, and a warehouse storage facility. The main building has a full commercial kitchen, dining facility, a small medical clinic,...

North Idaho College Parker Technical Education Center Entry

North Idaho College CTE

This new 110,960 sf facility, located on 40 acres of the Rathdrum Prairie, was designed to accommodate eight programs:  Machining/CNC, Welding Technology, Industrial Mechanics/Millwright, Architectural CAD Technology, Mechanical CAD Technology, Diesel Technology, Automotive Repair, and Collision Repair.  The program for the new facility required including...